Electrical and power

Commercial and industrial electrical services in the Inland Empire

AllSource Industrial Solutions builds, repairs, and maintains the electrical systems behind warehouses, distribution centers, plants, and commercial buildings across San Bernardino and Riverside counties. Electrical work books through the same Colton office that handles your dock and door service.

California contractor, CSLB License [[NEEDED: CSLB license number and every classification on it, e.g. C-10 Electrical]]

01 · Electrical construction

New construction, alterations, and improvements

We install and change the power and lighting systems in commercial and industrial buildings. A project runs from a site walk to a written scope, the permit, the installation, and the final inspection.

  • Service and distribution for new buildings and additions
  • Panel, switchboard, and feeder upgrades
  • Tenant improvement wiring for offices and production space
  • Warehouse and high-bay lighting, retrofits, and controls
  • Dedicated circuits for dock levelers, door operators, and restraints
  • Power for production equipment, compressors, and battery chargers
  • Exterior, yard, and parking lot lighting

02 · Electrical service and repair

Electrical repair calls we take most often

A breaker keeps tripping
We trace the circuit and the load behind it for overloads, shorts, and ground faults before anything gets reset.
Lights out in the aisles or at the dock
Fixtures, drivers, sensors, controls, and the circuits that feed them.
A leveler, door, or restraint has no power
The disconnect, the control panel, and the circuit back to the panel. Because we service the equipment too, one visit covers both sides of the problem.
Heat, buzzing, or a burning smell at a panel
Treat it as urgent. Keep people clear, avoid opening the panel, and call us. We inspect the connections, breakers, and bus.
Conduit or wiring hit by a forklift
Damaged raceway and exposed conductors repaired or rerouted, with guarding where the impact is likely to happen again.
New equipment and not enough capacity
A load review of the existing service, then the upgrade path if the building needs one.

03 · Electrical maintenance and infrared scanning

Find the hot connection before it fails

Loose or overloaded connections run hot long before they fail. An infrared camera shows that heat while the equipment is energized and carrying its normal load, so problems surface without a shutdown.

NFPA 70B, the national standard for electrical equipment maintenance, became a full standard in its 2023 edition. It calls for a documented electrical maintenance program and an infrared inspection of electrical equipment at least every 12 months, more often for equipment in poor condition.

  • Infrared scan of panels, switchgear, disconnects, motor controls, and transformers
  • Visual inspection for damage, moisture, and missing covers
  • Cleaning, tightening, and testing during scheduled shutdowns
  • A written report with thermal and visible images, ranked by priority
Equipment conditionInfrared inspection
Condition 1Like new, no deficienciesEvery 12 months or sooner
Condition 2Normal wear, serviceableEvery 12 months or sooner
Condition 3Needs attention or past findingsEvery 6 months or sooner

Intervals from NFPA 70B (2023), Table 9.2.2. Manufacturer instructions can call for more frequent service.

04 · Plans and permits

Electrical plans and permits, handled start to finish

We prepare the permit package, including plans and load calculations, submit it to the city or county building department, answer plan check comments, and meet the inspector on site.

California code, current edition

Electrical work follows the 2025 California Electrical Code, based on the 2023 National Electrical Code, which applies to permits filed on or after January 1, 2026. Lighting and controls in nonresidential buildings also have to meet Title 24, Part 6, the California Energy Code.

CSLB License [[NEEDED: CSLB license number and every classification on it, e.g. C-10 Electrical]]

05 · Solar and battery storage

Solar and battery storage, designed, installed, and serviced

We design and install solar and battery storage systems for commercial and industrial buildings, then keep them producing with scheduled maintenance and repair.

Under the 2025 California Energy Code, many newly constructed nonresidential buildings, including conditioned warehouses in some climate zones, have to include solar and battery storage. Batteries must carry a UL 9540 listing under the California Fire Code, and systems above the code's size limits need a fire department permit.

  • System design, equipment selection, and permitting
  • Installation of panels, racking, inverters, and batteries
  • Inspection, production checks, and maintenance
  • Inverter, wiring, and battery troubleshooting and repair

06 · Consulting

Talk through the project before it is designed or bid

Bring us an expansion, a new line of equipment, or a building you are about to lease. We review the existing service and equipment, the code and permit path, and a realistic budget and schedule, so the scope you send out matches what the building needs.

Schedule a Consultation

07 · Temporary power and lighting

Temporary power and lighting for the length of the job

The National Electrical Code allows temporary power and lighting for the duration of construction, remodeling, maintenance, repair, or demolition, and requires it to come out once that work is finished. Receptacles used by workers on site need ground-fault protection.

  • Temporary service and power distribution for job sites
  • Lighting for work areas, aisles, and exit paths
  • Power for site trailers, tools, and equipment
  • GFCI-protected receptacles for crews
  • Changes as the work moves through the building
  • Removal when the work is complete

08 · Backup and emergency generators

Backup and emergency generators that start when the power drops

We size and install standby generators and transfer switches, then maintain and test them so they carry the load during an outage.

Emergency systems
NEC Article 700. Life-safety loads such as egress lighting, restored within 10 seconds.
Legally required standby
NEC Article 701. Loads a code or authority requires to stay powered, restored within 60 seconds.
Optional standby
NEC Article 702. Loads a business chooses to protect, such as refrigeration, servers, or production.

Air permits in the Inland Empire

Most of the Inland Empire falls under the South Coast Air Quality Management District. An engine over 50 brake horsepower needs a permit to construct before it is installed, emergency standby operation is capped at 200 hours a year, and testing and maintenance hours are limited further. New permits generally take two to three months, so the application goes in early.

Maintenance and testing

For emergency power systems, NFPA 110 calls for a weekly inspection and a monthly exercise of at least 30 minutes at no less than 30 percent of the nameplate rating, plus an annual load bank test when the building load cannot reach that level.

Electrical service questions

How often should electrical equipment get an infrared scan?

NFPA 70B (2023), the national standard for electrical equipment maintenance, calls for an infrared inspection of electrical equipment at least every 12 months, and at least every six months for equipment in poor condition or with past findings. Manufacturer instructions can call for more frequent service.

Do new commercial buildings in California need solar and battery storage?

Many do. The 2025 California Energy Code, which applies to permits filed on or after January 1, 2026, requires solar and battery storage on many newly constructed nonresidential buildings, including conditioned warehouses in some climate zones. The requirement applies to new construction, and exceptions exist, so we confirm what applies to your project during design.

Is the federal tax credit still available for commercial solar?

Under the One Big Beautiful Bill Act, a commercial solar project that began construction after July 4, 2026 has to be placed in service by December 31, 2027 to qualify for the federal investment tax credit. Battery storage stays eligible on a longer timeline. Confirm your project with a tax advisor before counting on a credit.

Does a backup generator need an air quality permit?

In the South Coast Air Quality Management District, which covers most of the Inland Empire, an engine rated over 50 brake horsepower needs a permit to construct before it is installed. Emergency standby use is capped at 200 hours a year, with tighter limits on testing and maintenance hours. New permits generally take two to three months.

How long can temporary power stay on a job site?

The National Electrical Code allows temporary power and lighting for as long as the construction, remodeling, maintenance, repair, or demolition lasts. It has to be removed once that work is complete.

Do you handle the electrical permit?

Yes. We prepare the permit package, including plans and load calculations, submit it to the city or county building department, answer plan check comments, and schedule the inspections. Work follows the 2025 California Electrical Code, in effect for permits filed on or after January 1, 2026.

Tell us about the building and the electrical work